Make your landscaping invoice
Fill it in below and download a finished PDF. No account needed, and nothing is saved.
Your details
Customer
What you are billing for
| Description | Qty | Rate | Amount | |
|---|---|---|---|---|
| £0.00 | ||||
| £0.00 | ||||
| £0.00 | ||||
| £0.00 |
Free. Nothing is saved, so keep your own copy.
What a landscaping invoice looks like
A realistic example with the lines this trade actually bills. Figures are illustrative.
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Garden maintenance visit (2 staff, 3 hours) | 2 | £135.00 | £270.00 |
| Turf supply & lay (per m²) | 40 | £9.50 | £380.00 |
| Topsoil, 1 tonne bulk bag | 2 | £78.00 | £156.00 |
| Green waste removal & tip fees | 1 | £60.00 | £60.00 |
| Subtotal | £866.00 | ||
| VAT @ 20% | £173.20 | ||
| Total | £1,039.20 | ||
What to put on a landscaping invoice
- Number of staff and hours on site: two people for three hours is six labour hours
- Plants and materials listed with quantities and unit prices
- Green waste removal and tip fees as a separate line
- Plant and machinery hire as its own line, with the days or hours it covers
- Your waste carrier licence number if you remove waste
- Stage payments for larger projects, with what each stage covers
- Any plant establishment guarantee and what voids it
Tax, by country
The rules depend on where the work was done. This is general guidance, not tax advice.
United Kingdom
If you are VAT registered, show your VAT number and the VAT rate (usually 20%). Under the CIS scheme, construction work for a contractor may need a deduction shown separately.
This is the one most landscapers get wrong. Ongoing garden maintenance is outside CIS. Landscaping carried out as part of a construction project is inside it, so the same crew can move in and out of the scheme between jobs in a week.
HMRC: VAT invoicesUnited States
Sales tax on labour varies by state, and many states tax materials but not labour. Show your EIN if you have one, and keep the tax line separate from the subtotal.
Landscaping is named as a taxable service in a number of states, and some tax maintenance rounds while leaving new planting alone. Check yours before you price a recurring round.
IRS: employer identification numberCanada
Show GST/HST (or QST in Quebec) as its own line with your GST/HST number. The rate depends on the province where the work was done, not where you are based.
CRA: charge and collect the GST/HSTAustralia
If you are registered for GST, the document must say "Tax Invoice", show your ABN, and state the GST amount (10%). Without an ABN the customer may have to withhold 47%.
ATO: tax invoicesCIS and landscaping work
Landscaping is the trade CIS catches out most, because one business can be inside the scheme on Tuesday and outside it on Wednesday. What decides it is not your job title. It is whether the work counts as a construction operation.
Which jobs fall inside it
Groundworks, paths, patios, walls, drainage and decking built as part of a build or a renovation are construction operations. A monthly maintenance round is not, and neither is grass cutting or hedge trimming. Planting a border on its own sits outside; the same planting as the closing stage of a new-build garden usually sits inside.
It only applies when a contractor pays you
Invoice a homeowner directly and CIS does not apply, no matter how much groundwork the job involved. It only bites when the payer is a contractor, and they have to verify you with HMRC before the first payment.
What actually comes off
20% if you are registered and verified, 30% if you are not. It comes off the labour only. Materials, plant hire and VAT are left alone, which is the practical reason each belongs on its own line rather than inside one total.
The deduction is not lost money
It is an advance payment against your own tax and National Insurance, and you offset it later. The contractor has to give you a payment and deduction statement within 14 days of the tax month ending. Keep them, because those statements are what let you claim the money back.
You can stop being deducted from
If your turnover and filing record qualify, you can apply to HMRC for gross payment status and be paid in full. Worth doing if contractor work is most of your income rather than the odd job.
The VAT twist almost nobody mentions
When CIS applies and both sides are VAT registered, the domestic reverse charge usually applies too. You do not charge the VAT; the contractor accounts for it. Your invoice has to say so, and wording along the lines of "reverse charge: customer to pay the VAT to HMRC" is what HMRC expects to see.
Get paid while they are still looking at the garden
The customer walks out, sees the new turf down and the waste gone, and is about as pleased as they are going to get. Build the invoice on your phone, show a QR code, take the card payment there. On a staged project the same invoice goes out per stage.
Start freeFree plan: 3 invoices a month and 3 clients. No card required.
Questions landscapers ask
How do I invoice for a maintenance round?
Invoice monthly with each visit dated on its own line, or use a recurring invoice. Clients on a round want to confirm you attended as often as they were charged.
Should I charge separately for waste removal?
Yes. Tip fees are a real cost with receipts behind them, and burying them in labour makes your hourly rate look higher than it is.
How do stage payments work on a landscaping project?
Split the quote into stages (deposit, materials, completion) and invoice each as it is reached, stating what the stage covered. It protects your cash flow on jobs with heavy material costs.
How do I invoice for landscaping work?
Start from what you quoted, then list labour, plants and materials, machinery hire and waste separately. Put the site address on it, because most landscapers bill one customer for work at more than one property over a year. Date it, number it, and say when payment is due rather than leaving it open.
Should the invoice match the quote exactly?
Match it line for line where the work matched, and show anything extra as its own line with a short note saying what changed. An invoice that quietly comes in higher than the quote is the single fastest way to turn a finished job into a dispute.